材料调差表.xlsx
《材料调差表.xlsx》由会员分享,可在线阅读,更多相关《材料调差表.xlsx(14页珍藏版)》请在沃文网上搜索。
1、绿色为填空区域单位数量风险系数基准单价投标单价风险范围钢筋At5005%4000400038004200钢筋Bt5005%4000410038004305钢筋Ct5005%4000390037054200名称单位数量购买单价投标单价调差价结算单价 是否调差钢筋At6003900400004000否4100400004000否4250400050405050*60037504000-503950-50*600钢筋Bt5004200410004100否3900410004100否4350410045414545*50037504100-504050-50*500钢筋ct40041003900039
2、00否3900390003900否4250390050395050*40036503900-553845-55*400信息价投标价 施工平均价风险率105.00%1.91%485.75485.75519.316.91%510.049.279.2725单单项项材材料料价价差差调调整整表表(合合同同基基价价至至施施工工期期价价)工程名称:序号材料名称规格、型号及特殊要求单位数量合同基准期价(元)风险系数(%)涨价上调起点(元)跌价下调起点(元)1HPB300直径10t12.689267752810.852543.152HPB300 圆钢10kg1345.6942.63752.772.514HPB3
3、00圆钢直径10t8.114267752810.852543.155HPB300圆钢直径10t0.027263752768.852505.156HPB300圆钢10 t7.473267752810.852543.157HRB400直径1216t6.71269452828.702559.308HRB400钢筋直径1216t190.86269452828.702559.309HRB400螺纹钢直径1216t75.881269452828.702559.3010HRB400螺纹钢1216 t37.838269452828.702559.3011HRB400螺纹钢1825 t120.069255352
4、680.652425.3514柴油(机械)kg104648.377.3557.726.9816镀锌扁铁-50*5m6601.357.8558.247.4617镀锌角钢L50*5*2500根244.1137.7539.5935.8218干混地面砂浆M20t1.9262745287.70260.3019干混地面砂浆M15t0.2442625275.10248.9020干混地面砂浆M7.5t160.9932625275.10248.9021干混抹灰砂浆M20t22.6823165331.80300.2022干混抹灰砂浆 t0.5982735286.65259.3523干混砌筑砂浆M5t1.34123
5、25243.60220.4024干混砌筑砂浆M10t4.2182475259.35234.6525干混砌筑砂浆M7.5t34.2582235234.15211.8526干混砌筑砂浆 t45.7312235234.15211.8527干混砌筑砂浆M20t10.3542735286.65259.3528钢管 kg3004.0644.154.313.9029钢管503mmm1685.28616.07516.8715.2730钢筋直径10t1.82231552430.752199.2531钢筋综合t0.152231752432.852201.1533螺纹钢10t7.413230952424.45219
6、3.5534商品混凝土C15m3406.482985312.90283.1035商品混凝土C30m31139.0633285344.40311.6036商品混凝土C20m33625.8683135328.65297.3537商品混凝土C25,S4m365.3443335349.65316.3538商品混凝土C25,S4m352.3823335349.65316.3539商品混凝土C25m3367.8523235339.15306.8540商品混凝土C40m337.8083635381.15344.8541商品混凝土C35(水下)m3323.5823585375.90340.1042商品混凝土
7、C30P8m3347.7713635381.15344.8543商品混凝土 C35P8m3364.9913785396.90359.1044水泥42.5kg1152597.270.37550.390.3645水泥32.5kg88999.460.31350.330.3046水泥32.5(袋装)t6.553135328.65297.3547摊销卡具和支撑钢材 kg1366.872.94653.092.80施工期信息价(元)价差(元)合 价(元)2698.0000.002.6300.002698.0000.002629.0000.002698.0000.0000.002764.0000.002764
8、.0000.002739.0000.002739.0058.357006.036.01-0.9725-101770.546.90-0.5575-3680.2536.9400.00274.0000.00262.0000.00262.0000.00316.0000.00273.0000.00232.0000.00247.0000.00223.0000.00223.0000.00273.0000.004.0200.0014.00-1.2665-2134.412698.00267.25486.402698.00265.1540.302764.00339.552517.08298.0000.00336.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
20 积分
下载 | 加入VIP,下载更划算! |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- 材料 调差表